Milestone
-
2017
2017.08 HERON Neutron Medical Corp. Established -
2019
2019.08 Signed a Memorandum of Cooperation with CMU -
2020
2020.08 Settled in Hsinchu Biomedical Science Park -
2021
2021.04 Purchase Accelerator2021.11 Built the AB-BNCT Laboratory in China Medical University -
2022
2022.01 Obtained High-Intensity Radiation Facility Install License2022.05 Obtained Medical Equipment Manufacturing Selling License2022.12 Top Out the First AB-BNCT Treatment Center in CMU, Taiwan2022.12 Obtained The Medicine Selling License2022.12 Won the 19th National Innovation Award in 2022 -
2023
2023.05 Completion AB-BNCT treatment Center and obtained license2023.09 Won the 20th Taipei Biotech Awards Innovation Silver Award2023.09 Obtained the Operation Permit of AB-BNCT Base In CMU2023.12 The Hsinchu Science Park Innovation Award in 2023 -
2024
2024.02 Obtain High-Intensity Radiation Facility Operation Certificate2024.05 HERON BNCT Center Inaugurated2024.06 Obtained Generate Ionizing Radiation Equipment License2024.06 Obtained domestic medical device manufacture License2024.07 Obtain AB-BNCT Medical Equipment License, First In Taiwan